“ Identifying the Factors Causing Delay of Shop Drawings Process ‎in Construction Projects: A Case Study” (2025) Journal of University of Babylon for Engineering Sciences, 33(6), pp. 1–17. doi:10.29196/jubes.v33i6.6157.