[1]
“ Identifying the Factors Causing Delay of Shop Drawings Process ‎in Construction Projects: A Case Study”, JUBES, vol. 33, no. 6, pp. 1–17, Dec. 2025, doi: 10.29196/jubes.v33i6.6157.